Platform Every 2 Meter Rule:
NOTE: We supply the correct amount of components with all our towers. please keep this in mind when shopping/ comparing on the internet.
Manufacturer Prices
Free Delivery
In our opinion, the Lewis Climalloy 250 is the most versatile Tower on the market. With 250mm spacing between the rungs, you have increased flexibility in platform heights.
The LEWIS Climalloy 250 industrial tower offers increased flexibility in platform heights. Our 8 rung tower system fully complies with the latest UK regulations, product standards and requirements. Not only do we ensure the highest manufacturing quality, but our 8 rung towers comply to BSEN1004.
Our Lewis Climalloy 8 rung tower has a 250mm pitch span frame for increased strength and stability, and can therefore be climbed at either end. Suitable for heavy-duty projects of all shapes and sizes. The LEWIS Climalloy industrial tower has a safe working load of 275kg per platform level up to a maximum of 950kg per tower (including self-weight).
In our opinion, the Lewis Climalloy 250 is the most versatile Tower on the market. With 250mm spacing between the rungs, you have increased flexibility in platform heights.
The LEWIS Climalloy 250 industrial tower offers increased flexibility in platform heights. Our 8 rung tower system fully complies with the latest UK regulations, product standards and requirements. Not only do we ensure the highest manufacturing quality, but our 8 rung towers comply to BSEN1004.
Our Lewis Climalloy 8 rung tower has a 250mm pitch span frame for increased strength and stability, and can therefore be climbed at either end. Suitable for heavy-duty projects of all shapes and sizes. The LEWIS Climalloy industrial tower has a safe working load of 275kg per platform level up to a maximum of 950kg per tower (including self-weight).
150mm Locking Castors | 4 |
500mm Adjustable Legs | 4 |
4 Rung 1m Frames | 0 |
6 Rung 1.5m Frame | 0 |
8 Rung 2m Frames | 2 |
Trap Door Platform | 1 |
Horizontal Brace (red trigger) | 6 |
Diagonal Brace (blue trigger) | 2 |
(New style) Complete Toe-board Set | 1 |
Standard Stabilisers | 0 |
Jumbo Stabilisers | 0 |
Instruction Manual &British Kite Mark Certificate | 1 |
If you have any questions regarding what size towers you should be purchasing or even what type of scaffolding would be correct for you, please do not hesitate to contact us.
We are here to help with all your access needs no matter how low. As of 2010, we now have our own in-house health and safety officer available to answer all your questions on best practices and procedures when dealing with working at height. He will also be available to answer question not just related to scaffold towers but all types of health and safety.